The taps are in place, the ceiling is missing and the carpet is ripped up (too far)

A misunderstanding between the project manager and the builder resulted in our carpet being ripped up too far which means they will be replacing the whole lot – at their cost of course. What a drama that will be considering everything is piled up in the small lounge space at the moment.

Dan the husband has informed me the house is caked in a thick layer of dust.  Not looking forward to that when I get back considering I sneeze with the normal layer we have.

The taps in the bathroom are in place and the slider door is in.

We also have a lovely gaping hole in the kitchen where the ceiling should be.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s